
Woldiya-Alamata Road Upgrading Construction Project
Client: China Wanbao Engineering Corporation
Location: Amhara Region
Design:MH Engineering Plc
Major tasks include development of tender design of the roadway and drainage structures, which includes 14 bridges with deep pile foundations and more than 300 culverts
Road Class: DC6
Pavement type: Asphalt Concrete
Total Length: 78.3 km