Friday, 26 April 2024 | Login

Woldiya-Alamata Road Upgrading Construction Project

Woldiya-Alamata Road Upgrading Construction Project

Client:     China Wanbao Engineering Corporation

Location:   Amhara Region

Design:MH Engineering Plc

Major tasks include development of tender design of the roadway and drainage structures, which includes 14 bridges with deep pile foundations and more than 300 culverts

Road Class: DC6  

Pavement type:   Asphalt Concrete

Total Length:   78.3 km